2026 Capital Bond Proposal Home
2026 Capital Bond Proposal
Building a Stronger Foundation for the Future
On May 19, residents of the Pearl River School District will be asked to consider a $61.4 million bond to fund comprehensive renovations to essential infrastructure in all school buildings. The proposed project scope addresses critical needs identified in the district’s most recent NYSED Building Conditions Survey and priorities voiced by families, students and staff in our Capital Project Community Survey.
A stronger foundation for student success starts with healthy, safe and comfortable learning environments. Please vote on May 19.
Questions? Email capitalproject@pearlriver.org.
BOND & BUDGET VOTE
Tuesday, May 19, 2026
7AM-9PM
All voting takes place at Pearl River High School’s Pirate Cove
275 East Central Avenue, Pearl River
District-wide School Renovations
- New heating, ventilation and air conditioning (HVAC) systems, including upgrades to:
- All elementary school multipurpose spaces
- Pearl River Middle School cafeteria and gymnasium
- Pearl River High School auditorium and gymnasium
- Boiler replacement at each school
- New ceilings and LED lighting in selected areas of each school
- Roof removal and replacement at each school
District-wide Safety and Security Upgrades (All Schools)
- Lockdown system integration and installation of notification strobes
- Exterior access control enhancements
- Interior door replacements and hardware upgrades
- Fire alarm system upgrades and expansion of coverage
Improvements to Support Student Wellness and Programming
- Playground resurfacing and equipment upgrades to the Blauvelt Road playground at Evans Park Elementary School and rear playgrounds at Lincoln Avenue Elementary School and Franklin Avenue Elementary School
- Renovation of PRMS library media center, computer room and technology classroom; sink, faucet and casework replacement in science classrooms; athletic field drainage improvements and new irrigation system
- Renovation of PRHS locker and team rooms; gym floors, bleachers, basketball goals and divider walls; turfing of and drainage upgrades to softball, baseball and practice fields; and addition of visitor bleachers on multipurpose field
PROJECT COST
$63.6 million Total Project Budget
- $2.2 million Capital Reserve Funds
$61.4 million Total Bond*
*$373 annually
Estimated additional cost to residents with a home assessed at $200,000
CONSTRUCTION PERIOD
Summer 2027-Fall 2029
